Home   |    Chinese   |    English
--Flash Clip--
 
 Position:Home > News

Successful seatrail of CQS-1004
Date:2013-06-12  Source:  Author:  Visit  

The 35200DWT bulk carrier(CQS-1004) of our company had been docked safely with the help of the towing boat at AM 6:30 on June 12, 2013.The sea trial lasts for 7 days .Although it is affected by strong wind and heavy rain,all the trial tests had been successfully completed.Compared with previous 35000DWT vessel ,the consumption of oil had been decreased by 20%;and the overall length is 179.88M;the speed is 13.8KN.



Copyright(C) 2010 Nantong Changqingsha Ship Engineering Co.,Ltd. All rights reserved.
版权所有--南通长青沙船舶工程有限公司 www.ntcqs.cn